首页 > 新手区
[问题求助] SAE J1128与SAE J1127对应线材的火花测试电压是多少?
P:2023-07-02 10:22:18
2
6.6 Insulation Faults
This is an in-process testintended for mass production of all cable covered in this document. The test electrode shall be of the link or bead-chain type and shall make intimate contact with the cable surface under test. The speed of the cable and the length of the electrode field shall ensure that each point of the cable is loaded with at least nine complete voltage cycles.
The test voltage is 2 kV (AC).
dual take-up system with fully automatic reel loading and unloading device - 设有全自动上下盘装置的双盘收线系统 (1) 投诉
P:2023-07-04 17:14:28
4
游客:6.6 Insulation Faults
This is an in-process testintended for mass production of all cable covered in this document. The test electrode shall be of the link or bead-chain type and shall make intimate contact with the cable surface under test. The speed of the cable and the length of the electrode field shall ensure that each point of the cable is loaded with at least nine complete voltage cycles.
The test voltage is 2 kV (AC).
请问下这段是在哪个标准里面的? 谢谢!
strapped - 用皮带装饰的, 用皮绳捆住的, 身无分文的 (0) 投诉
5

你需要登录才能发表,点击登录。