首页 > 通讯电缆

[问题求助] 急!测试求助!

P:2011-09-07 11:58:05

1

请教下,这个是什么测试?如何做?
4.3 shield impedance and current capacity, for each 3 meter section of cable,the shield must be capable of withstanding 30 amps of current for 2 minutes with the impedance not exceeding 0.10 ohms.

binding - 绑扎,扎结,扎线 (0) 投诉

P:2011-09-07 12:28:07

2

这个我还真不清楚  抱歉

multiple twin cable - 复对绞电缆 (0) 投诉

2


你需要登录才能发表,点击登录