首页 > 专业英语|国际贸易
[翻译求助] 要回复国外客户的投诉,有一段话的英语翻译想讨教
P:2008-11-11 15:24:48
1
为了活跃一下论坛气氛,希望大家踊跃参与,也希望版主能对好句子给予奖励.
"该线材为双支平行扁线,在生产过程中由于一支铜线存在跳线导致押出突然断线,而当主机慢速停机时,收线盘却在继续收线,因另一支铜线未断线,这样,在力的作用下押出的线材仍在运行,为此便造成押出的线材一边有导体一边无导体。"
[MartinPeng 在 2008-11-11 15:39:19 编辑过]
回复: 为求助做出贡献的朋友,我们都会给予奖励.
[appleseden 在 2008-11-13 15:28:04 编辑过]
wired telecommunication - 有线通信 (0) 投诉
P:2008-12-13 14:12:15
10
<DIV dir=ltr style="TEXT-ALIGN: left">To return to the foreign customer complaints, </DIV><DIV dir=ltr style="TEXT-ALIGN: left">if there was a period of the English translation would like to advice
In order to look lively atmosphere of the Forum, we hope to take part in, and hope that the moderator can sentence a good reward.
"The support wire for the two-flat parallel lines in the production process due to the existence of a copper extrusion jumper lead to a sudden break, and when the host slow down, set-up has continued in the collection line, as a result of another copper Line is not broken, so that the extrusion force under the wire is still running, this has resulted in the extrusion side of the wire there is no conductor side of the conductor. "</DIV>
In order to look lively atmosphere of the Forum, we hope to take part in, and hope that the moderator can sentence a good reward.
"The support wire for the two-flat parallel lines in the production process due to the existence of a copper extrusion jumper lead to a sudden break, and when the host slow down, set-up has continued in the collection line, as a result of another copper Line is not broken, so that the extrusion force under the wire is still running, this has resulted in the extrusion side of the wire there is no conductor side of the conductor. "</DIV>
dual extrusion crosshead - 双层挤出机头 (0) 投诉
P:2009-03-21 13:38:56
15
Investigation Result:The defective part described in the quality report is the twin conductor flat wire. During extrusion, one of the two conductors was discontinued due to the feeding rod broken. The failure was detected and the machine was brought down to stop. However, when the main motor slowing down to stop, the receiving reel was still being driven by the motor and collected a certain length of the single conductor wire in the spool before it reached final stop. Corrective Action:。。。。。。。。。。。。。。。。。 对国外客户, 最重要的不只是调查报告,而是整改措施。如果你们不能改进设备,提高质量控制水平,上面讲的只是空话。所以,你的回复一定要加上整改措施。要不就等着你的客户换供应商吧。
indirect crosstalk - 间接串音 (0) 投诉
17
你需要登录才能发表,点击登录。