首页 > 国外线缆
1
[问题求助] 客服有个线材性能测试要求。英文小白 求大神翻译下!
P:2012-12-22 17:39:10
1
pull test:
pre-conditioning : storage at -40℃ for 24 hours,and then aiiow to stabilize at room temperature for 1.5hours before stressing。
static load:27N(2.7Kg)applied at 15cm from the SR(strain relief)
positions:8 positions located 45° apart
duration: 1 minute per position
求那位大神帮忙翻译下。
submersible-transformer cable - 漫没式变压器用电缆 (0) 投诉
1
你需要登录才能发表,点击登录。